The nuclear power station Ågesta was the first Swedish commercial nuclear power plant. Also known as R3, it was the third nuclear reactor built in Sweden. Construction started in 1957 and ended in 1962, operations began in 1964 and continued until 1974.
The station was built underground, used heavy water moderation and was fueled with natural uranium. The station primarily provided district heating for the Stockholm suburb Farsta, as well as a small amount of electricity, 12 MW. It is widely assumed that the underground reactors had military purposes, being able to produce plutonium. The cost of construction was estimated at SEK 50 million but the final cost was SEK 230 million.The companies Stockholms Elverk and Statens Vattenfallsverk were responsible for the building of the Ågesta plant. Before it was finished, another larger reactor, the R4 nuclear reactor was built at Marviken. The R4 reactor was intended for both electricity and plutonium production but it was cancelled in 1970.
Wikipedia https://en.wikipedia.org/wiki/Ågesta_Nuclear_Plant
Address (Unnamed Road), Sweden
Coordinates 59°12'21.624" N 18°4'57.673" E