Rawang Bypass, Federal Route 37 also known as Rawang–Serendah Highway, is a federally-funded divided highway bypass in Rawang, Selangor, Malaysia. The 10-km highway was opened to traffic on 28 November 2017 at 9.00 pm. Construction of the RM628mil Rawang Bypass began on 16 July 2005 and was completed on 21 November 2017. It features a 2.7-km elevated viaduct with its highest pillar of 58.2 meter. the highest of its kind in Malaysia.The Rawang Bypass FT37 was built to solve the traffic congestion along the Malaysia Federal Route 1 in the town centre of Rawang. It was reported that the travelling time from Serendah to Selayang via the Kuala Lumpur–Ipoh Road FT1 may take up to 2 hours due to severe congestion in Rawang town centre. The Rawang Bypass FT37 helps to reduce the travelling time to only 30 minutes.
Download Download See moreWikipedia https://en.wikipedia.org/wiki/Rawang_Bypass
Address Lebuhraya Rawang, 48000, Malaysia
Coordinates 3°17'54.845" N 101°36'40.186" E